SOE7069 – Woodchurch Road, Tenterden
Last Update: 12.09.2024
PROJECT: SOE7069
Location: Woodchurch Road, Tenterden
Project Complete.
Update: 29.08.2024
Our WCB Utilities team have now opened Woodchurch road. We only have a small final connection to do on this road, our team have moved into Knockwood Road and Summer close to finish off this project. Our gas team, reinstatement team and our support drivers have performed to a high level to enable this road to be opened two weeks earlier than our scheduled date.
Update: 15.08.2024
We have now opened Woodchurch road as we only have a small final connection to do on this road, our team have moved into Knockwood Road and Summer close to finish off this project. Our gas team, our reinstatement team and our support drivers have performed to a high level to enable this road to be opened up two weeks earlier than our scheduled date.
Update: 31.07.2024
Our closure is at the junction of Beacon Oak Road, we have completed the replacement of the gas main between Eastgate Road and Beacon Oak Road. We are now working on the section between Eastgate Road and Knockwood Road.
We are also collaboratively working with the council so they can complete some resurfacing works and install new bus stops, this is to avoid them needing to close the road again in the near future.
Update: 05.07.2024
We have a mandatory gas mains replacement on Woodchurch road, which is a high risk main. We will be replacing 700m of old metallic main while replacing the high risk section.
This will be with a road closure on Woodchurch Road, this road closure will be at the junction of Appledore Road. Once the main road is completed we will be finishing the replacement in Summer Close and Knockwood Road.